Skip to main content
Menu

Whole-home custom cabinetry

Whole-home custom cabinetry for Australian homes and projects

Kitchens, wardrobes, vanities, interior doors and wall panelling — designed as one system, produced in our own plant, and shipped direct to site.

What we actually do

We are the workshop, not the middle of the chain

Most cabinetry that arrives in Australia from China passes through at least two hands before it reaches the workshop. Ours does not. Drawings, panel cutting, edge banding, drilling, dry-assembly and packing all happen under one roof, which is why changes can be made late and why a replacement panel can be matched to a batch produced six months ago.

  • Setting-out drawings and a panel schedule issued for your sign-off before production
  • Panels labelled to the drawing, so site assembly does not rely on guesswork
  • One finishes schedule across kitchen, robes, vanities, doors and panelling
  • Container loading plans produced for your freight forwarder, not left to the shipper
Wide view of a living room with full-height joinery

Browse by space

Start from the room you are standing in

Each range is documented the way a buyer needs it: what is included, what the standard depths and profiles are, and the questions that come up on Australian sites.

Most requested

Joinery that gets specified again and again

These are the configurations Australian builders and designers come back for — not because they are fashionable, but because they install predictably.

Four things that decide whether a factory-direct kitchen actually lands on site

Importing cabinetry from China is not difficult. Importing cabinetry that fits, matches and arrives documented is. These are the four points we hold ourselves to on every package.

  • Our own plant, not a trading desk

    Production, not outsourcing

    Panels are cut, edged and drilled in our own workshop in Nanchang. When a drawing needs changing, the person who changes it is standing next to the machine.

  • One specification, whole house

    Kitchen, robe, vanity, doors, panels

    Finishes, edge treatments and hardware are agreed once and carried across every room, so the house does not read as five separate purchases.

  • Drawn to your plans

    Shop drawings before any panel is cut

    We produce setting-out drawings and a panel schedule for sign-off before production starts. Nothing is cut from a verbal description.

  • Factory-direct pricing

    You buy from the plant that makes it

    No importer margin sits between the workshop and your project. Quotations are itemised by room and by panel, not lumped into one number.

Project references

How a whole-home package is put together

Each reference explains the scope, the decisions that mattered and what the installer received with the shipment.

Double-height living pavilion

Reference configuration

Double-Height Living Pavilion

A living volume two storeys high needs joinery that holds its line at distance. The work here is mostly about proportion: how high the display shelving goes before it reads as a bookcase, and where the TV niche sits relative to the eye line from the sofa.

Curved ceiling living room

Reference configuration

Curved Ceiling Family Living

A curved bulkhead forces every vertical panel under it to be measured individually, because no two are the same height. We template the bulkhead on site, then cut each panel to its own dimension.

Timber bedroom suite

Reference configuration

Timber Bedroom Suite

The whole wall is one piece of joinery: robes at one end, a headboard panel in the middle, and a concealed door into the ensuite at the other end. Getting the door reveal to line up with the robe fronts is the whole job.

From drawings to delivery

Four stages, and what happens at each one

Cabinetry ordered from overseas goes wrong in the gaps between stages, not inside them. So every stage ends with a document you approve.

1 · Drawings and finishes

You send plans or a measured sketch. We return setting-out drawings, a finishes schedule and a panel list, and we do not cut until you approve them.

2 · Sample and sign-off

If the finish is not already settled, we send a physical sample of the door profile and board before the order is released.

3 · Production and dry assembly

Panels are cut, edged and drilled, then dry-assembled so that door gaps and runner alignment are checked before packing.

4 · Packing and loading

Every panel is labelled to the drawing, packed in installation order and photographed against the packing plan before the container is sealed.

Timber veneer, stone and joinery finishes in a living space

Materials & compliance

Boards, veneers and edge treatment, stated plainly

Australian buyers ask about emissions and moisture resistance before they ask about colour. Our materials pages set out the substrate, the edge band, the adhesive and how each maps to Australian expectations — with anything we cannot yet document marked as unconfirmed rather than glossed over.

Substrate options

Moisture-resistant particleboard and plywood carcasses, with moisture-rated boards specified for wet areas.

Edge treatment

ABS edge banding as standard, matched to the face finish rather than a generic white tape.

Documentation

Board declarations and hardware data sheets are issued with the shipment where the supplier provides them.

Trade channels

Three ways buyers work with us

Multi-unit builders need staged call-off. Designers need drawings that match a specification. Importers need container economics and private label. The terms differ, so the pages differ.

Living area joinery supplied as part of a whole-home package

Resources

What to check before you order

Substrates, hardware load ratings, compliance documents and the terms buyers ask about — all on these pages, not hidden behind an enquiry form.

Start here

Send us the plans you already have

You do not need a finished specification to start. A floor plan, a room schedule, or photographs of the space is enough for us to come back with a costed scope, a finishes direction and the questions we still need answered.

Living and dining joinery in a completed scheme
Call window
Sydney & Melbourne calls: 11:00–21:00 AEDT

Project enquiry

Fields marked with an asterisk are required. Everything else can be worked out in the reply.

rooms in scope, number of dwellings, target date, and anything already specified

Chat on WhatsApp

Or email us at shangge798@gmail.com