Every stage ends with a document you approve

This page exists because most disputes about imported cabinetry are not about quality — they are about expectations that were never written down. So we write them down, stage by stage.

The stages

Reviewing board samples together at the table

Stage 1 · Enquiry and scope

You send plans, a room schedule or photographs. We reply with an indicative scope, the categories that apply and the questions that must be answered before pricing.

Machine console running a cutting program

Stage 2 · Drawings and finishes

Setting-out drawings and a finishes schedule are issued. You mark them up; we revise. Nothing is cut until these are signed.

Edge banding trimmed and checked by hand

Stage 3 · Sample approval

Where the finish is not already settled, a physical sample of the door profile, board and edge band is sent for approval.

Panel being machined on the cutting line

Stage 4 · Production

Panels are cut, edged, drilled and dry-assembled. Door gaps, runner alignment and hinge positions are checked on the bench, not on site.

Panels labelled to the drawing before packing

Stage 5 · Packing and loading

Parts are labelled to the drawing, packed in installation order and photographed against the loading plan before the container is sealed.

An assembled cabinet unit checked on the bench

Stage 6 · Delivery and after-sales

Documentation travels with the shipment. Replacement parts are produced against the retained specification, not re-measured from scratch.

What we need from you at each stage

  • Stage 1 — plans or a measured sketch, and the rooms in scope
  • Stage 2 — sign-off on setting-out drawings and the finishes schedule
  • Stage 3 — approval of the physical sample, or an existing specification reference
  • Stage 4 — confirmation that no further changes will be made once cutting starts
  • Stage 5 — your freight forwarder's requirements and delivery address
  • Stage 6 — a site contact for delivery and any damage reported with photographs

Timing and terms

Quotation validity
To be confirmed
Production lead time
Counted from drawing sign-off, not from deposit
Transit time
Determined by the port and sailing schedule you book
Payment schedule
To be confirmed

Terms marked as pending are agreed in writing once drawings are reviewed and scope confirmed. We do not publish figures we have not verified.

Frequently asked

Can changes be made after production starts?
Once panels are cut, a change means remaking parts. We will do it where it is a genuine error on our side; where it is a change of mind, the affected parts are re-quoted. This is stated before cutting starts, not after.
What if a panel is damaged in transit?
Report it with photographs against the packing record, which is why we photograph the container before sealing. Parts are reproduced from the retained specification and sent with your next shipment or by air, whichever the schedule suits.